1. Kassicieh, S. K. and Schultz, C. R. Decision support flexible manufacturing systems. Omega, 1987, 15, 495–502.
doi:10.1016/0305-0483(87)90007-7
2. Potts, C. N. and Whitehead, J. D. Workload balancing and loop layout in the design of a flexible manufacturing system. Europ. J. Operat. Res., 2001, 129, 326–336.
doi:10.1016/S0377-2217(00)00230-7
3. Johnson, R. V. Optimally balancing large assembly line with Fable. Manag. Sci., 1988, 341, 240–253.
doi:10.1287/mnsc.34.2.240
4. Miltenburg, J. Optimally balancing large assembly lines: updating Johnson’s 1988 fable algorithm. Informat. Syst. Operat. Res., 2006, 44, 23–47.
5. Arbib, C., Lucertini, M. and Nicolò, F. Workload balance and part-transfer minimization in flexible manufacturing systems. Internat. J. Flexible Manufact. Syst., 1991, 3, 5–25.
doi:10.1007/BF00167523
6. Cesaní, V. and Steudel, H. A study of labor assignment flexibility in cellular manufacturing systems. Comput. Industr. Eng. Arch., 2005, 48, 71–591.
7. Kuula, M., Stam, A., Leino, S., Ranta, J. and Wallenius, J. Workload balancing in the manufacturing environment: a multicriteria trade-off analysis. Internat. J. Prod. Res., 1999, 37, 1459–1477.
doi:10.1080/002075499191085
8. Toba, H. and Yonekura, M. Dynamic load balancing among multiple fabrication lines. In Proc. Ninth International Symposium on Semiconductor Manufacturing ISSM 2000. Tokyo, 2000, 343–346.
9. Younis, M. A. and Mahmoud, M. S. An algorithm for dynamic routing in FMS under an unpredicted failure. Appl. Math. Modell., 1992, 16, 141–147.
doi:10.1016/0307-904X(92)90065-B
10. Plaquin, M. and Pierreval, H. Cell formation using evolutionary algorithms with certain constraints. Internat. J. Prod. Econ., 2000, 64, 267–278.
doi:10.1016/S0925-5273(99)00064-X
11. Eaton Lean System: An Interactive Introduction to Lean Manufacturing Principles. Productivity Press Development Team, Productivity Press, New York, 2001.